Knowledgebase
- What are the policies and procedures for the allocation of telescope time?
- Never forget the overheads!
- How to choose between Service (SM), Visitor (VM) and designated Visitor (dVM) Mode?
- Which are the OPC Categories?
- Does my proposal have higher chances of being approved if I propose a short programme?
- Can I change the list of targets of my approved proposal without affecting my scientific goal?
- Do I need to account for overheads in my total exposure time when submitting Service Mode OBs?
- What is the accuracy of the UTs pointing and tracking?
- Instrument-specific FAQ (UVES) (Phase 2)
- Instrument-specific FAQ (VISIR) (Phase 2)